Screed Depth Calculator: Sand/Cement vs Liquid Screeds, Drying Times and Moisture Testing
Screed depth calculator: 65–75mm sand/cement floating, 30mm anhydrite minimum, 30mm cover above UFH pipe crown, BS 8204 standard, drying rate 1mm/day, ≤75% RH hygrometer threshold before flooring